Scaffolding provides a temporary, safe working platform for activities such as:
It is formed from individual tubes and joints or, proprietary components. For more information, see: Scaffolding.
High-quality workmanship and careful inspection is vital for the erection and dismantling of scaffolding, which must be undertaken by competent personal under supervision. For more information, see: Scaffold register.
Construction workers sometimes rush when dismantling scaffolding in an effort to finish on site quickly, involving workers without adequate training, and proceeding during unsuitable conditions. But the safe and efficient dismantling of scaffolding demands as much training and careful consideration as its erection. Unless it is unavoidable, scaffolding should not be taken down in potentially hazardous conditions such as high winds, rain, snow, and so on.
The first step in the dismantling process is to clear a space where the scaffolding components can be set down and stacked in an organised and safe manner. Access for a vehicle to transport the components to a loading area should be provided wherever possible with a clear path to carry them from the structure.
Workers should have all the necessary personal protective equipment (PPE), including safety boots, hard hats, gloves and protective eyewear to guard against the risk of falling materials. When on the scaffold itself, safety harnesses may be necessary. Particualr care should be taken, as during the course of the scaffold being used, edges can become sharp and pose risks to those dismantling.
The scaffold structure should then be examined from the base to the top for any visible hazards, loose items on the working platforms, or hung items on the piping. Ties, braces or timber that has been loosened or removed should be put back in place before dismantling begins.
The process of dismantling proceeds in the reverse order of erection, beginning at the top with the piping and guardrail before proceeding to the platform planking. The components can be passed down from person-to-person, or lowered to the ground using a rope system or hoist. They should not be stacked or left on the structure temporarily but brought to the ground straight away. Care should be taken to ensure that no one is stood directly below where the components are being dismantled, and they should never be thrown off the structure to the ground.
Part of the platform planking will need to be removed while still being used, and the remainder removed from the section beneath. Only once the entire platform being supported has been removed should the ties securing the structure to the building be removed.
The scaffolding components should be inspected when they have been dismantled and those that need to be disposed of set to one side away from those that are fit for re-use.
A partially-dismantled scaffold should not be left standing for any longer than is necessary, but if it cannot be avoided then clear warning signs should be provided at access points.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Home builders call for suspension of Building Safety Levy
HBF with over 100 home builders write to the Chancellor.
CIOB Apprentice of the Year 2024/2025
CIOB names James Monk a quantity surveyor from Cambridge as the winner.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
Treasury responds to sector submission on Warm Homes
Trade associations call on Government to make good on manifesto pledge for the upgrading of 5 million homes.
A tour through Robotic Installation Systems for Elevators, Innovation Labs, MetaCore and PORT tech.
A dynamic brand built for impact stitched into BSRIA’s building fabric.
BS 9991:2024 and the recently published CLC advisory note
Fire safety in the design, management and use of residential buildings. Code of practice.
Comments
¡Good Morning!
I've been reading this article about How to remove scaffolding, and I really want to thank for this information, because I consider this topic is very important, as much as the scaffolding Assembly. Follow the instructions and try to maintain the security of all is fundamental in every project! this article is quite complete and useful! thanks again... ¡¡¡I recommend it!!